Layouts, cabinets, and counters measured to your space, not a catalog

Custom kitchen remodel Nashville TN built around how you actually cook

A custom kitchen remodel Nashville TN homeowners can live with starts with honest measurements and a plan for your real cooking habits. We handle the design, demolition, cabinetry, countertops, and finish work in one coordinated job. Whether you want a custom kitchen renovation Nashville TN with a bigger island or a full layout change, we walk you through every phase before a single cabinet comes down.

↗
Fast online booking

Request service today

Tell us what is happening. Our local team will confirm your visit shortly.

No spam. No obligation. Just practical help.
Thanks — we'll call shortly to confirm your visit.
Dependable kitchen remodeler across Nashville, Tennessee
Careful work. Honest options.
About this service

What a custom kitchen remodel Nashville TN actually involves

A custom kitchen remodel Nashville TN is a ground-up rebuild of the room's layout, storage, and surfaces around your specific measurements and routines. It is not a cabinet swap. We start by mapping the work triangle between your range, sink, and refrigerator, then check the wall framing with a stud finder and laser level before we order anything. From there the job covers new shaker cabinets or plywood cabinet boxes, quartz countertops or granite countertops cut to template, a ceramic tile backsplash, and LED under cabinet lighting wired to code under the NEC National Electrical Code.

Most Nashville homeowners call us because the original kitchen in a 1950s or 1990s house no longer fits how they live. The layout is tight, the storage is short, and the lighting is one ceiling fixture over a dark counter. If you have been searching for a custom kitchen remodel near me Nashville TN and getting cookie-cutter quotes, we price the actual scope: moving a wall, upgrading to a farmhouse sink, or running a dedicated circuit for a Sub-Zero refrigerator. We also handle the permits through Davidson County so the inspection record follows the house.

  • ✓ Storage that fits your gear
  • ✓ Lighting you can actually cook under
  • ✓ Surfaces that survive a busy house
  • ✓ A layout that works for years
What's included

What is included in a custom kitchen remodel

A full custom kitchen remodel covers the design, permits, demolition, rough-in, cabinets, countertops, tile, flooring, lighting, and finish trim. We list every inclusion and exclusion in the written scope so you know exactly what the price covers before demolition starts. Appliance purchase is separate unless you ask us to source them.

✓

Design and layout plan

We draw the cabinet run, island, and appliance positions to scale and review the plan against the IRC before ordering. You see the layout on paper and walk through the clearances before anything is built. Changes at this stage cost nothing; changes after cabinets are ordered cost time.

✓

Permits and inspections

We pull the Davidson County permits and schedule the rough-in and final inspections. You get a copy of every permit and the inspection record for your files. That record matters at resale, and it proves the electrical and plumbing work was done to code.

✓

Cabinets and countertops

We install shaker cabinets or flat-panel doors on plywood cabinet boxes, with soft close hinges and full-extension slides. Countertops are templated after cabinets are set and installed in quartz, granite, marble, butcher block, or solid surface. Undermount sinks get cut and sealed on site.

✓

Tile, flooring, and lighting

The finish package includes a ceramic tile backsplash or subway tile, porcelain tile or luxury vinyl plank flooring, and LED under cabinet lighting on dedicated circuits. We level the subfloor before flooring goes down, which matters in older Nashville homes where floors have settled.

✓

Finish trim and punch list

We install the toe kicks, crown, window trim, and outlet covers, then walk the room with you. Every item on the punch list gets fixed before we hand over the keys. You leave with care instructions for the countertops, cabinets, and flooring so the finishes stay in shape.

How it works

How our custom kitchen remodel process runs

01

On-site measure

We spend 60 to 90 minutes in your kitchen checking wall plumb, floor level, and the electrical panel. A stud finder and laser level tell us what is behind the drywall before anyone commits to a layout. You get a written scope and a realistic budget range within two business days.

02

Design and selections

We lay out the cabinet run, island size, and appliance positions, then walk you through door styles, finishes, and countertop slabs. You pick from quartz, granite, marble, or solid surface countertops and choose between ceramic tile backsplash and subway tile. This phase takes one to three weeks depending on how fast you make selections.

03

Permits and ordering

We pull the Davidson County permits and order cabinets and appliances. Cabinet lead times run four to eight weeks in 2026, so we order early and schedule the crew around the delivery date. You get a copy of every permit and the inspection schedule before work starts.

04

Demo and rough-in

The crew protects the floors and seals off the work zone with plastic and zip walls. Demolition takes one to three days. Then we move plumbing and electrical, frame any new openings, and hang drywall with a drywall lift so the ceiling stays clean. Rough-in inspection happens before any cabinet goes in.

05

Install and punch list

Cabinet install runs three to five days using cabinet clamps and a laser level to keep the run dead flat. Countertops template after cabinets, then install seven to ten days later. Tile, flooring, and trim follow. We walk the room with you, fix the punch list, and hand over care instructions for every surface.

Tools & methods

Tools and methods we use on every kitchen

Purpose-built equipment, used by trained technicians — so the job is done accurately the first time.

Table saw and miter saw

Used to cut cabinet filler strips, trim, and crown on site so the fit is exact. A sharp blade and a stable outfeed table keep the cuts clean, which matters on painted cabinets where a chip shows.

Laser level and stud finder

The laser level keeps the cabinet run dead flat across a long wall, and the stud finder locates framing before we hang cabinets or cut into a wall. Both get checked against the plan before a single screw goes in.

Router and oscillating multi-tool

The router cuts sink openings and edge profiles on butcher block. The oscillating multi-tool handles fine cuts around outlets and trim without tearing up the drywall, which saves patching time.

Drywall lift and cabinet clamps

A drywall lift holds ceiling panels in place while they are screwed off, which keeps the ceiling flat. Cabinet clamps pull cabinet boxes tight together so the run has no gaps and the doors line up.

Tile cutter and caulking gun

The tile cutter makes clean cuts on ceramic tile and subway tile for outlets and edges. The caulking gun lays a consistent bead of sealant at the counter and backsplash joint so water cannot get behind the tile.

Nail gun

Used for trim, toe kicks, and cabinet crown. A nail gun sets the fastener at the right depth so the trim sits flush without hammer marks, which saves filling and sanding time.

Real results

Before and after.

Galley kitchen opens up in East Nashville

Before

A 1948 bungalow with a 7-foot-wide galley kitchen, one ceiling light, and cabinets that stopped 18 inches short of the ceiling. The wall to the dining room was load-bearing, and the original wiring was cloth-wrapped.

After

We removed the wall with a properly sized beam, opened the kitchen to the dining room, and added a 6-foot island with butcher block. New shaker cabinets run to the ceiling, and LED under cabinet lighting runs both walls. The room gained 22 inches of counter space and seating for three.

1990s kitchen rebuilt in Donelson

Before

A 1994 kitchen with worn out cabinets, a cracked laminate countertop, and a leaky kitchen sink that had stained the cabinet floor. The layout worked, but the finishes were past their life.

After

We replaced the cabinet boxes with plywood cabinets, installed quartz countertops with an undermount sink, and set a ceramic tile backsplash. New porcelain tile flooring went down over a leveled subfloor. The job finished in five weeks and came in under the original estimate.

Builder-grade upgrade in The Nations

Before

A 2018 build with stock cabinets, a small island, and a single overhead light. The owner cooks daily and the kitchen did not have the storage or the counter space for it.

After

We built a custom cabinet run to the ceiling, replaced the island with a larger one topped in quartz, and added dedicated circuits for the range and dishwasher. Three lighting zones replaced the single fixture. The job took six weeks and added 30 percent more usable storage.

Problems we solve

Kitchen problems we fix with a custom build

Most of the kitchens we tear out have the same handful of problems: a layout that fights the cook, storage that ran out years ago, and lighting that leaves the counter in shadow. Here is how we solve each one.

Ask a pro →
01

Outdated kitchen layout with no room to work

We redraw the work triangle and check clearances against the IRC, including the 36-inch walkway minimum. Moving a wall or reconfiguring the cabinet run usually opens the room without adding square footage. On a recent 12South job, we gained 18 inches of counter space by shifting the refrigerator to the opposite wall.

↗
02

Insufficient storage space and worn out cabinets

We replace fixed shelves with deep drawers and pull-outs, run cabinets to the ceiling, and swap MDF boxes for plywood cabinets where moisture is a risk. Soft close hinges and full-extension slides come standard. Most jobs gain 20 to 35 percent more usable storage without adding floor space.

↗
03

Poor kitchen lighting and dark counters

We layer task, ambient, and accent lighting on separate circuits. LED under cabinet lighting runs the length of the counter and aims at the backsplash so the surface reads bright without glare. We also add dedicated outlets for small appliances so you are not unplugging the coffee maker to use the mixer.

↗
04

Cracked countertops and a failing sink setup

We replace the counter with quartz or granite cut to a fresh template, install an undermount sink sealed on site, and test the plumbing before we close the wall. If we find mold behind the backsplash or water damaged cabinet boxes, we stop, show you photos, and price the repair before we proceed.

↗
Proof you can check

Credentials and reviews

✓
NARI Certified Kitchen and Bath RemodelerNational Association of the Remodeling Industry
✓
NKBA Certified Kitchen DesignerNational Kitchen and Bath Association
✓
EPA Lead-Safe Certified FirmU.S. Environmental Protection Agency
✓
Tennessee Home Improvement LicenseTennessee Board for Licensing Contractors
✓
Davidson County Contractor LicenseDavidson County
Good questions

Kitchen remodel questions Nashville homeowners ask us

(615) 909-7503 →

Most full custom kitchens in Nashville run $45,000 to $110,000 in 2026, with a mid-range job landing near $65,000. A small galley kitchen with stock-size cabinets can come in closer to $30,000. The biggest cost drivers are cabinet grade, countertop material, and whether we move plumbing or electrical. Layout changes and appliance upgrades push the number up; keeping the sink and range where they are keeps it down.

The right remodeler for you is the one who shows you a written scope, pulls permits, and puts the same crew on your job from demo to punch list. Ask for the Tennessee Home Improvement License, proof of insurance, and two recent kitchens you can walk through. We will show you our NARI and NKBA credentials and connect you with past clients in your neighborhood before you sign anything.

A full custom kitchen includes design and layout, permit pulling, demolition, plumbing and electrical rough-in, new cabinets and countertops, backsplash tile, flooring, lighting, and finish trim. Appliance purchase is usually separate unless you ask us to source them. We list every inclusion and exclusion in the written scope so there is no confusion about what the price covers.

Plan on six to ten weeks on site for a full kitchen, plus four to eight weeks of cabinet lead time before demo starts. Small kitchens with in-stock cabinets can finish in four to five weeks. The countertop template and install adds seven to ten days in the middle of the schedule. We give you a dated calendar before demolition so you know when the crew is on site and when the room is yours again.

Ready when you are

Get your custom kitchen remodel Nashville TN plan started

We measure your kitchen, talk through layout options, and give you a written scope with a realistic budget range. No pressure and no guesswork. Call (615) 909-7503 and we will schedule your on-site measure this week.

Schedule My Measure (615) 909-7503 →
Request an appointment

Call our Nashville kitchen remodeler

Call (615) 909-7503 or email info@mendarotech.com and we will set up a walkthrough. We answer the phone during business hours and keep the 24/7 line open for emergencies. Most estimates get scheduled within a few business days, and we give you a written number before any work starts.

Call anytime(615) 909-7503Email the officeinfo@mendarotech.shop
Office hoursOpen 24 hours · 7 days a week
Request received — our team will be in touch shortly.
Tap to call(615) 909-7503