Custom cabinetry, stone counters, and lighting done right the first time

High End Kitchen Remodel Nashville TN, Built to Last

A high end kitchen remodel Nashville TN homeowners can actually live in starts with the layout, not the finishes. We rebuild the bones first, then layer in the quartz, the soft close hinges, and the LED under cabinet lighting that make a kitchen feel finished. If you have been putting off a premium kitchen remodel Nashville TN because the last contractor left you guessing, we walk you through every phase before the first cabinet comes down.

↗
Fast online booking

Request service today

Tell us what is happening. Our local team will confirm your visit shortly.

No spam. No obligation. Just practical help.
Thanks — we'll call shortly to confirm your visit.
Local kitchen remodeler team in Nashville
Careful work. Honest options.
About this service

What a High End Kitchen Remodel Nashville TN Really Involves

A high end kitchen remodel Nashville TN is a full-scope rebuild of the working core of your kitchen: layout, cabinetry, countertops, lighting, plumbing, and electrical, finished to a standard you would expect in new construction. That means pulling the old boxes and worn out cabinets, checking for water damaged cabinet boxes and mold behind backsplash, then rebuilding with plywood cabinets, quartz countertops, and an undermount sink set into a properly sealed deck. We handle the framing, the rough-in, and the finish work under one contract.

Most Nashville homeowners call us after living with an outdated kitchen layout for years, usually one with insufficient storage space and poor kitchen lighting that makes the room feel smaller than it is. In older homes around East Nashville and Woodbine, we regularly find uneven kitchen flooring and failing kitchen faucets hiding behind a cosmetic refresh. If you have been searching for a high end kitchen remodel near me Nashville TN, the first step is a walkthrough where we measure the room and talk through what your kitchen actually needs.

  • ✓ Storage That Actually Fits
  • ✓ Lighting You Can Cook Under
  • ✓ Surfaces That Take Abuse
  • ✓ Code-Correct From the Start
What's included

What a High End Kitchen Remodel Includes

Our high end kitchen remodel Nashville TN scope covers the full rebuild: demolition, framing, rough-in, cabinetry, countertops, tile, flooring, lighting, and finish work, with permits and inspections handled. Appliance packages and structural changes are quoted separately once we see the room, and we tell you that upfront so the estimate is honest.

✓

Custom Cabinetry and Storage

Plywood cabinet boxes, shaker or flat front doors, soft close hinges, and drawer organizers planned around what you actually store. We build to the ceiling where the room allows, which adds storage and cuts down on the dust ledge above the cabinets.

✓

Countertops and Backsplash

Quartz countertops, granite countertops, or marble countertops templated after the cabinets are set, with an undermount sink cut and sealed seams. Ceramic tile or subway tile backsplash set on proper substrate with sealed grout and a caulked counter line.

✓

Lighting and Electrical

Layered lighting with task, ambient, and accent zones, including LED under cabinet lighting over the work areas. GFCI protection, dedicated appliance circuits, and outlet placement planned at the rough-in stage so nothing gets added after the drywall is closed.

✓

Plumbing and Ventilation

New or relocated supply and drain lines, a properly set undermount or farmhouse sink, a tested faucet and garbage disposal, and a range hood that vents outside. Ventilation is a code item, not an upgrade, and we build it that way.

✓

Flooring and Finish Work

Subfloor leveling followed by porcelain tile flooring, luxury vinyl plank flooring, or hardwood flooring. Trim, paint, and hardware close out the job, and we protect the rest of the house during demo so the mess stays in the kitchen.

How it works

How Our Kitchen Remodel Process Works

01

Walkthrough and Measure

We come out, measure the room, and look at what is behind the walls. That includes checking the cabinet boxes for water damage, testing the existing plumbing, and confirming the electrical panel can carry the new appliance load. You get a written scope and a realistic timeline before any deposit changes hands.

02

Design and Selection

You pick the layout, the cabinet style, and the surfaces. We walk you through shaker cabinets versus flat front, quartz versus granite countertops, and porcelain tile flooring versus hardwood, with real samples in hand. Appliance selections like Sub-Zero, Wolf, or KitchenAid get finalized here so the cabinet dimensions are cut correctly.

03

Demo and Rough-In

We protect the rest of the house, tear out the old kitchen, and open the walls. Plumbing, electrical, and ventilation get roughed in and inspected before anything goes back. This is the phase where we find the surprises, and we tell you about them the same day rather than at the end of the job.

04

Install and Finish

Cabinets go in level and plumb, then the countertops get templated and set. Tile, flooring, backsplash, and fixtures follow, with the sink, faucet, and garbage disposal connected and tested. Trim, paint, and hardware close it out. Most kitchens are usable again within a few days of the final inspection.

05

Final Walk and Warranty

We walk the finished kitchen with you, demonstrate the appliances, and hand over the care instructions for the counters and cabinets. Anything on the punch list gets handled before we call the job closed. You leave with a workmanship warranty and a direct number for anything that comes up later.

Tools & methods

Tools and Methods We Use on Every Kitchen

Purpose-built equipment, used by trained technicians — so the job is done accurately the first time.

Table saw and miter saw

Cutting cabinet stock, trim, and filler panels to fit the room. A kitchen is rarely square, and the saw work is what makes the cabinets look built-in instead of dropped in.

Laser level and stud finder

Setting cabinet runs level and plumb and locating framing before anything gets fastened to the wall. Level cabinets are what keep the countertop seams tight and the doors aligned.

Router and oscillating multi-tool

Cutting sink openings, fitting trim, and cleanly notching cabinet backs for outlets and supply lines. Clean cuts mean fewer patches and a better finish.

Tile cutter and caulking gun

Setting ceramic tile and subway tile backsplash with consistent grout lines, then sealing the counter line and the sink perimeter so water stays out of the cabinet boxes.

Drywall lift and cabinet clamps

Hanging ceiling patches safely and holding cabinet boxes tight while the fasteners set. Clamping before fastening is what keeps the cabinet faces flush across a long run.

Nail gun and jigsaw

Trim, toe kicks, and cutouts for sinks and outlets. Fast, consistent, and clean enough that the finish carpentry does not need to be caulked into submission.

Real results

Before and after.

1940s Bungalow Kitchen Rebuilt in East Nashville

Before

The kitchen had original cabinets with water damaged boxes under the sink, uneven kitchen flooring, and a single ceiling fixture that left the counters in shadow. The range hood recirculated into the room, and the faucet had been leaking into the cabinet base for years.

After

We replaced the cabinet boxes with plywood cabinets, leveled the subfloor, and installed porcelain tile flooring and quartz countertops. A new exterior-venting hood and layered LED under cabinet lighting went in, and the inspection passed on the first visit. The project ran 11 weeks.

Green Hills Kitchen Opened Up and Replanned

Before

A large kitchen with a walled-off layout that made the work triangle awkward. The island was undersized for the room, storage was insufficient, and the lighting was two recessed cans over the sink. The homeowners had been quoted for a cosmetic refresh that would not have fixed the layout.

After

We removed the non-bearing wall section, replanned the island at 8 feet with seating clearance, and added tall cabinets to the ceiling. New quartz countertops, a ceramic tile backsplash, and layered lighting went in. Usable storage increased by roughly 40 percent.

The Nations New Build Kitchen Made Functional

Before

An open-plan kitchen in a newer build with basic cabinetry, no usable pantry, and a range hood that vented into the room. The island had no electrical, so small appliances ran off a counter outlet across the kitchen. The counters were cracked at the sink cut.

After

We rebuilt the island with electrical and a proper overhang, added floor-to-ceiling cabinetry, and replaced the countertops with quartz set on a level deck. The hood now vents outside and the lighting is on dimmers. The project took 9 weeks.

Problems we solve

Kitchen Problems We Fix for Nashville Homeowners

Most of the kitchens we tear out were not badly built. They were built for a different decade and never updated. Here are the problems we run into most often on a high end kitchen remodel near me Nashville TN project.

Ask a pro →
01

Outdated kitchen layout with a blocked work triangle

We re-plan the work triangle around the sink, range, and refrigerator, then size the island and cabinet runs to the new paths. Moving a door or a wall opening is often the cheapest way to gain usable space, and we check whether it is load-bearing before we quote it.

↗
02

Water damaged cabinet boxes and mold behind the backsplash

We pull the affected cabinets, treat or remove the mold, and replace the damaged boxes rather than covering them up. The leak source gets fixed first, whether it is the faucet, the supply line, or the caulk line at the counter, so the new kitchen does not repeat the problem.

↗
03

Poor kitchen lighting and a range hood that does not vent outside

We layer task, ambient, and accent lighting, including LED under cabinet lighting over the counters, and we install a hood that vents to the exterior through the shortest practical run. Electrical and ventilation get inspected before the drywall goes back up.

↗
04

Uneven kitchen flooring under new cabinets

We level the subfloor before anything else goes down, then set the cabinets on a flat plane. That keeps the countertop template accurate and means the porcelain tile flooring or hardwood flooring stays flat and quiet underfoot.

↗
Proof you can check

Licensed, Insured, and Inspected

✓
NARI Certified RemodelerNational Association of the Remodeling Industry
✓
NARI Certified Kitchen and Bath RemodelerNational Association of the Remodeling Industry
✓
NKBA Certified Kitchen DesignerNational Kitchen and Bath Association
✓
EPA Lead-Safe Certified FirmU.S. Environmental Protection Agency
✓
Tennessee Home Improvement LicenseTennessee Board for Licensing Contractors
Good questions

Kitchen Remodel Questions We Hear Every Week

(615) 909-7503 →

Most high end kitchen remodels in Nashville run $75,000 to $150,000 in 2026, with larger kitchens and premium appliance packages pushing past $200,000. The biggest cost drivers are cabinetry, countertop material, and whether the layout changes require moving plumbing or electrical. We itemize the estimate so you can see exactly where the money goes before you sign.

The best remodeler is the one who pulls permits, shows you a certificate of insurance, and can explain the layout before talking about finishes. Ask for the NARI or NKBA credentials, ask to see a current jobsite, and ask what happens if an inspection fails. We answer all three on the first call, and we will walk you through a finished kitchen if you want to see the work.

A high end kitchen in Nashville is defined by the bones, not the price tag. Full plywood cabinet boxes instead of MDF, quartz or marble countertops set level and sealed, a real ventilation hood that vents outside, layered lighting including LED under cabinet lighting, and a layout that fits how you cook. Premium appliances like Sub-Zero or Wolf help, but the construction quality is what separates a high end kitchen from a cosmetic refresh.

A premium kitchen renovation in Nashville typically takes 8 to 14 weeks from demo to final inspection. Cabinet lead times are the biggest variable, often 4 to 8 weeks on their own, and layout changes that move plumbing add time. We give you a phase-by-phase schedule at the start and update it weekly so you are never guessing when the kitchen comes back online.

Ready when you are

Start Your High End Kitchen Remodel Nashville TN

We pull permits, pass inspections, and hand you a kitchen that works. Call Mendaro Tech at (615) 909-7503 and we will schedule a walkthrough, measure the room, and give you a written scope before you commit to anything.

Schedule a Walkthrough (615) 909-7503 →
Request an appointment

Call our Nashville kitchen remodeler

Call (615) 909-7503 or email info@mendarotech.com and we will set up a walkthrough. We answer the phone during business hours and keep the 24/7 line open for emergencies. Most estimates get scheduled within a few business days, and we give you a written number before any work starts.

Call anytime(615) 909-7503Email the officeinfo@mendarotech.shop
Office hoursOpen 24 hours · 7 days a week
Request received — our team will be in touch shortly.
Tap to call(615) 909-7503