Cabinets, counters, tile, and light - done in one clean pass.

Kitchen Makeover Nashville TN Built to Last

A kitchen makeover Nashville TN homeowners actually use starts with the layout you have, not the one a catalog sells you. We pull worn cabinets, set new shaker doors on soft close hinges, drop in quartz countertops, and re-light the whole room with LED under cabinet lighting. Whether you want a full rebuild or a kitchen refresh in Nashville, we scope it, price it, and finish it.

↗
Fast online booking

Request service today

Tell us what is happening. Our local team will confirm your visit shortly.

No spam. No obligation. Just practical help.
Thanks — we'll call shortly to confirm your visit.
Experienced kitchen remodeler professionals at work
Careful work. Honest options.
About this service

What a Kitchen Makeover Nashville TN Really Involves

A kitchen makeover Nashville TN is a targeted remodel that replaces the surfaces and systems you touch every day - cabinet fronts and boxes, countertops, backsplash, flooring, sink and faucet, lighting, and ventilation - without necessarily moving walls or rerouting the whole house. We start with a stud finder and laser level, map what is behind the drywall, then build the plan around the plumbing and electrical that already exist. That keeps the budget on the finishes instead of the demolition.

Most of the kitchens we walk into in Davidson County share the same three problems: outdated kitchen layout from a 1980s or 1990s build, insufficient storage space, and poor kitchen lighting that makes even a good countertop look tired. Water damaged cabinet boxes under the sink and cracked countertops around the sink cutout show up on maybe one in three calls. If you have been searching for a kitchen makeover near me Nashville TN and getting nothing but showroom tours, we do the walk-through, the measurements, and the written scope in one visit.

  • ✓ Storage That Actually Works
  • ✓ Surfaces Built for Cooking
  • ✓ Light Where You Need It
  • ✓ A Faster, Cleaner Job
What's included

What Is Included in a Kitchen Makeover

Every makeover we quote covers the labor, the haul-away, and the permits the job needs. The list below is what comes standard. Appliances, structural changes, and window replacement are priced separately if you want them added.

✓

Demo and Debris Removal

We pull the old counters, doors, backsplash, and flooring, protect the walk path, and haul everything out. Debris leaves the same day it comes down, so you are not living next to a dumpster for a month.

✓

Cabinet Install and Hardware

New boxes or refaced fronts set level on shims and cabinet clamps, with soft close hinges and full-extension drawer slides. We align every door across the run before we call it done.

✓

Countertop Template and Set

Quartz, granite, marble, butcher block, or solid surface, templated after the cabinets are set. Undermount sink cutout included, with the seam placed where it is least visible.

✓

Backsplash and Flooring

Ceramic tile backsplash set over a prepped substrate, and your choice of porcelain tile, luxury vinyl plank, or hardwood flooring, leveled and finished with trim.

✓

Plumbing and Electrical

New faucet, sink, and disposal hooked up, plus LED under cabinet lighting and any new circuits run to NEC standards. We test every connection before the walk-through.

✓

Paint, Caulk, and Punch List

Walls and trim painted, joints caulked with a caulking gun, and a written punch list worked to zero. You sign off only when the room is finished.

How it works

How Our Kitchen Makeover Process Runs

01

On-Site Walk-Through

We come out, measure every wall, check the cabinet boxes for water damage, and open the panel to see what the electrical can carry. You get a written scope and a fixed price, usually within 48 hours. No showroom appointment required.

02

Design and Selections

You pick door style, countertop, backsplash, and flooring from real samples we bring to the house. We confirm the cabinet line - KraftMaid, Merillat, or Thomasville - and lock the lead times, which run 3 to 5 weeks on semi-custom doors.

03

Demo and Rough-In

We pull the old counters and cabinet fronts, cap the plumbing, and handle any framing or electrical changes. A drywall lift goes up if ceilings need patching. This phase runs 2 to 4 days on a typical makeover.

04

Install

New cabinet boxes and doors go in on cabinet clamps and shims, then the countertop template is taken. Tile, flooring, sink, faucet, and lighting follow in sequence so nothing gets installed twice. This is the bulk of the schedule, 8 to 14 working days.

05

Punch List and Walk-Through

We caulk, touch up paint, test every outlet and the disposal, and run the dishwasher through a full cycle. You walk the room with us and sign off on a punch list. Anything left gets fixed before we pull the truck out.

Tools & methods

Tools and Methods We Bring to the Job

Purpose-built equipment, used by trained technicians — so the job is done accurately the first time.

Table Saw and Miter Saw

Cutting cabinet filler, trim, and countertop substrate to fit the room's actual corners, which are never perfectly square.

Laser Level and Stud Finder

Setting a true line for upper cabinets and finding the framing behind the drywall before we hang anything heavy.

Oscillating Multi-Tool and Jigsaw

Clean cutouts for sink openings, outlet boxes, and the range hood duct without tearing up the surrounding surface.

Tile Cutter and Caulking Gun

Precise backsplash cuts around outlets and window trim, and a clean caulk bead at the counter-to-wall joint that will not crack.

Cabinet Clamps and Drywall Lift

Holding cabinet boxes tight while the screws set, and lifting ceiling patches into place safely on a one-person crew.

Router and Nail Gun

Edge profiles on butcher block and trim, and fastening face frames and casing without splitting the wood.

Real results

Before and after.

1980s Oak Kitchen to Quartz and Shaker

Before

A 1988 kitchen in Donelson with oak cabinet doors, a laminate counter cracked at the sink, and one ceiling fixture that left the prep zone in shadow. The cabinet boxes were solid but the doors were worn through the finish.

After

New shaker doors on soft close hinges, Cambria quartz countertops, a ceramic tile backsplash, and LED under cabinet lighting on a dimmer. The layout stayed put, so the job finished in 16 working days and came in under the full-remodel quote by about 40 percent.

Leaking Sink Base Rebuilt in East Nashville

Before

A 1940s bungalow where the sink had been dripping into the cabinet base for years. The particleboard floor of the cabinet was soft, mold had started behind the backsplash, and the faucet was original to the house.

After

We cut out the damaged base, set a plywood cabinet box rated for moisture, treated the mold, replaced the faucet and supply lines with a Moen setup, and set a new quartz top with a braced undermount sink. The cabinet has stayed dry through two humid summers since.

Condo Galley Opened Up in The Gulch

Before

A tight galley kitchen in a Gulch condo with a single overhead light, laminate counters, and no usable vertical storage. The owner wanted it to feel bigger without moving plumbing in a concrete building.

After

Cabinet-depth pantry storage, a narrower counter run with a butcher block top, LED under cabinet lighting, and a luxury vinyl plank floor leveled over the concrete. The room gained 22 inches of usable storage and finished in 11 working days.

Problems we solve

Kitchen Problems a Makeover Fixes

Most of the calls we get are not about style. They are about a kitchen that stopped working. Here are the four we see most in Nashville, and what we do about them.

Ask a pro →
01

Water damaged cabinet boxes under the sink

We cut out the damaged base, replace it with plywood cabinets rated for moisture, fix the leak at the source, and treat any mold before the new backsplash goes up. The new box outlasts the original.

↗
02

Cracked countertops around the sink cutout

We template and set a new quartz or granite top with a properly supported sink cutout, so the stress point is reinforced instead of hanging over a void. Undermount sinks get a steel brace, not just adhesive.

↗
03

Poor kitchen lighting and a weak range hood

We add LED under cabinet lighting over the counters, put the fixtures on a dimmer, and vent the range hood to the exterior. The circuit gets sized to NEC so the hood and the lights do not fight for load.

↗
04

Uneven kitchen flooring and a failing faucet

We level the subfloor before any new flooring goes down, then set porcelain tile or luxury vinyl plank over a flat surface. The faucet and supply lines get replaced at the same time, so the cabinet stays dry.

↗
Proof you can check

Licensed, Certified, and Accountable

✓
Tennessee Home Improvement LicenseTennessee Board for Licensing Contractors
✓
Davidson County Contractor LicenseMetro Nashville Codes Department
✓
NARI Certified RemodelerNational Association of the Remodeling Industry
✓
NKBA Certified Kitchen DesignerNational Kitchen and Bath Association
✓
EPA Lead-Safe Certified FirmU.S. Environmental Protection Agency
Good questions

Kitchen Makeover Questions Nashville Homeowners Ask

(615) 909-7503 →

Most kitchen makeovers in Nashville run $18,000 to $45,000 in 2026, with a cosmetic refresh (doors, counters, backsplash, paint) landing near the low end and a full cabinet and layout rebuild near the top. Quartz countertops, semi-custom cabinets, and new flooring are the three biggest line items. We give you a fixed written price after the walk-through, so the number does not move unless you change the scope.

The best contractor is the one who shows you a written scope, a fixed price, and a crew you can meet before demo day. Ask for the Tennessee Home Improvement License, the Davidson County contractor license, and proof of insurance. We carry all three, hold NARI Certified Remodeler status, and will hand you references from jobs in your own neighborhood. Call (615) 909-7503 and we will set the walk-through.

A standard makeover covers cabinet fronts or full boxes, countertops, backsplash, sink and faucet, flooring, lighting, and paint. We handle demo, haul-away, permits, and the final punch list. Appliances, structural wall removal, and window replacement are quoted separately if you want them. Most customers add LED under cabinet lighting and a new range hood because the electrical is already open.

Plan on 2 to 4 weeks of on-site work for a makeover that keeps the existing layout, plus 3 to 5 weeks of cabinet lead time before we start. A full gut remodel with wall changes runs 8 to 12 weeks. We give you a start date and a finish date in writing, and we call you if anything on the schedule moves.

Ready when you are

Get Your Kitchen Makeover Nashville TN Priced

One walk-through, one written price, one crew from demo to punch list. Call (615) 909-7503 and we will put your kitchen makeover on the schedule - most walk-throughs happen within a week of the call.

Book a Walk-Through (615) 909-7503 →
Request an appointment

Call our Nashville kitchen remodeler

Call (615) 909-7503 or email info@mendarotech.com and we will set up a walkthrough. We answer the phone during business hours and keep the 24/7 line open for emergencies. Most estimates get scheduled within a few business days, and we give you a written number before any work starts.

Call anytime(615) 909-7503Email the officeinfo@mendarotech.shop
Office hoursOpen 24 hours · 7 days a week
Request received — our team will be in touch shortly.
Tap to call(615) 909-7503